What Can Be Done In 30 Minutes?

Quite a lot actually! Take a look below.

Pre-finished products installed into an already painted wall.

Feature Corner Connectors

Just a sample of how we do it.

“Fast installation with perfectly finished corner features that eliminate accurate mitre joins. A very clever solution." 

Video 1: Skirting Installation

Fit outs that took weeks can now be completed in days.

Superior finish will certainly leave an impession.

Video 2: System Installation

Inter-Join® taking construction into the 21st Century.

It's that simple!

“This will be the new industry standard that all finishes are measured against."